Panel Schedule Load Analyzer.exe

Beckify Electrical Engineering Toolbox / local-first analysis

Panel Schedule Load Analyzer

Photograph two views: the printed schedule/directory card, and the breaker dead-front. The breaker photo sizes the table to the real space count; the schedule photo fills descriptions. Take or upload each view. On-device Tesseract.js is the default. Optional Enhance with AI can read glare and two-up cards. Edit every row, then calculate. Manual entry still works with no photo. Informational estimate — not an electrical inspection. Not perfect OCR and not an AI electrician.

Image Intake
Privacy before you pick a photo. The photos stay on this device. They are never uploaded to Beckify or any server unless you turn on Enhance with AI and then click Read both views. On-device Tesseract.js is the default. The images are not saved after you leave or reset.
Two required views — cover on. Schedule: the printed directory card on the door. Breakers: the dead-front handles and amp stamps with the cover on. Never open a live panel or photograph the bus / lugs. Square each view, fill the frame, use even light, and avoid glare.

1. Schedule / directory

Printed circuit card on the panel door. Take a photo or upload one. For a tall 42- or 84-circuit card, add the bottom half. Up to 3 photos per view, 5 total (AI reads are limited to 5 per 15 minutes).

No schedule photo yet

Schedule / directory preview
Schedule preview

2. Breakers / dead-front

Photograph the breaker row with the cover on so the tool can count spaces and size the table. Take a photo or upload one. Add another shot for a tall panel. Up to 3 photos per view, 5 total.

No breaker photo yet

Breaker / dead-front preview
Breaker preview

Add a schedule photo and a breaker photo — take or upload each — or type rows by hand. No files selected
0%
OCR Review + Manual Corrections

Use 1.00 when no documented diversity study exists. Values above 1.00 reduce the summed circuit demand to an estimated coincident panel demand.

Ckt Load Description Trip/Amps Poles Load Type Est. Load A Demand % Action

Correct any circuit, trip, poles, or estimated load before you calculate. Changing a row clears the review check. Print still waits for the review box. Informational estimate — not an NEC Article 220 calculation.

Directory metrics (from the reviewed table)

Written for someone who is not an electrician. These numbers come from the table above after you review it and click Calculate. They are a photo-based estimate, not a measurement and not an inspection.

Persistent disclaimer: informational estimate from a photo or typed directory, not an electrical inspection. Any safety concern goes to a licensed electrician.

Electrical Load Summary

“Est. Load A” may start as the breaker-trip value and is flagged “copied from trip — edit me” until you replace it with measured/scheduled current or documented FLA. Trip amps are not a reviewed load. This is a planning estimate—not an NEC Article 220 load calculation, an equipment rating, or a protection setting. Informational only; any safety concern goes to a licensed electrician.

Print Preview