1. Schedule / directory
Printed circuit card on the panel door. Take a photo or upload one. For a tall 42- or 84-circuit card, add the bottom half. Up to 3 photos per view, 5 total (AI reads are limited to 5 per 15 minutes).
No schedule photo yet
Beckify Electrical Engineering Toolbox / local-first analysis
Photograph two views: the printed schedule/directory card, and the breaker dead-front. The breaker photo sizes the table to the real space count; the schedule photo fills descriptions. Take or upload each view. On-device Tesseract.js is the default. Optional Enhance with AI can read glare and two-up cards. Edit every row, then calculate. Manual entry still works with no photo. Informational estimate — not an electrical inspection. Not perfect OCR and not an AI electrician.
No custom URL yet. If the Beckify API base is injected at deploy, that proxy will be used. Otherwise Read both views stays on-device.
Printed circuit card on the panel door. Take a photo or upload one. For a tall 42- or 84-circuit card, add the bottom half. Up to 3 photos per view, 5 total (AI reads are limited to 5 per 15 minutes).
No schedule photo yet
Photograph the breaker row with the cover on so the tool can count spaces and size the table. Take a photo or upload one. Add another shot for a tall panel. Up to 3 photos per view, 5 total.
No breaker photo yet
Use 1.00 when no documented diversity study exists. Values above 1.00 reduce the summed circuit demand to an estimated coincident panel demand.
| Ckt | Load Description | Trip/Amps | Poles | Load Type | Est. Load A | Demand % | Action |
|---|
Correct any circuit, trip, poles, or estimated load before you calculate. Changing a row clears the review check. Print still waits for the review box. Informational estimate — not an NEC Article 220 calculation.
Written for someone who is not an electrician. These numbers come from the table above after you review it and click Calculate. They are a photo-based estimate, not a measurement and not an inspection.
Persistent disclaimer: informational estimate from a photo or typed directory, not an electrical inspection. Any safety concern goes to a licensed electrician.
“Est. Load A” may start as the breaker-trip value and is flagged “copied from trip — edit me” until you replace it with measured/scheduled current or documented FLA. Trip amps are not a reviewed load. This is a planning estimate—not an NEC Article 220 load calculation, an equipment rating, or a protection setting. Informational only; any safety concern goes to a licensed electrician.
Panel Schedule